Ive been building up my own company, Lenardo Design Group. I have 3 projects that ive been working on. One is a beautiful house right along the hudson river in upstate ny. The 2nd project is In north NJ from the same client as the house on the beautiful hudson river.(pics to come) Here are some pictures of the house in nyack on the hudson river. this house is getting a full automated control system with 17" touch screens in the kitchen master bedroom and 2 other bedrooms, which are HD capable as well so you can watch tv on them. A total of 7 plasmas ranging from 42" to 65". and one home theater system with top of the line Kef speakers .











..
I bought alot of equipment while working on the house in nyack and knew i would be needing it time and time again. I am a frequent visitor to home depot when a project starts. Now since I am starting out, each visit is usually for over 500 bux.I know it will all pay for itself so I am pretty much biting the bullet for now.
This next project I am working on has a funny story behind it. I was going to meet my parents for dinner at the dutchmans in LBI. I noticed a small boat in the water that looked just like my boat. Upon a closer view it turned out to be a rare 16' donzi with an outboard motor. I walked to our table which was right on the water and showed my dad the boat as well. Heres the funny part, after i had dinner . I end up seeing this guy at the gas station with his boat in tow. I needed gas also so we started talkin. Next thing you know hes askin what i do for a living? I tell him, "I design home theaters and smart houses" . He pauses and says really? I need you to do this house im building in loveladies. As soon as he says loveladies the Big house alram goes off in my head(or cash o meter LOL) So I know its a huge house
So, I get to the house and sure enough its a monster. I go through the entire house with the builder. He is building the house to sell it, if it doesnt sell hes movin in. The bank, the builder and I am hoping it will sell. The builder had four other proposals in his brief case which he showed me. None of them involved wiring the entire house just rooms here and there(SIGH). I ended up getting the job because of my insistancy that the entire house be wired. Even though the builder was reluctant he understood if its not done that way the house may not cater to the high tech families now a days. The builder himself is a great guy and this is his first time doing a smart house ever. So im in like flynn!! I ended up using over 5 thousand feet of various wires. heres some pictures


coming up from the 1st floor basement to the 2nd floor

Splitting up for the 2nd floor rooms (7 rooms one deck)and Going up to the third floor.

coming up to the third floor

going up to the third floor ceiling and being distributed to the 10 rooms and one deck as well as a 4th floor deck(roof)

Here are a couple videos i made to document the entire job. I document everything in case there is a need to go into the walls and fix or add more wires. I have Taken photos as well of every area covered in the video's. Each room is documented so any issues later on can be addressed efficiently
Here is the outside