November 22nd - 27th
Hello everyone, I've just gotten back from my trip down to Bogota Columbia to take part in filming for a television commercial for Peak. Peak is an energy drink based out of Bogota. The filming took part over three days for a total of 41 hours. There was 15 hours the first day (Saturday), 12 hours the next, and 14 hours the last day. It was a lot of fun and I met a lot of nice people down there. Bogota is a beautiful place and a lot safer than I thought it would be. I'm very excited about getting some acting experience though I didn't have any lines. I enjoyed the whole experience and I pray that something like that is not the last thing I do. Thanks to all the people down there that made my time so amazing. I will have the commercial, as well as, my behind the scenes and their behind the scenes on myspace as soon as they are released.